IAC Assessment: BD0401
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0401
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2011
Principal Product Commercial Zinc Plating
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 32
Plant Area (Sq.Ft.) 39,000
Annual Production 15,000 Thousand Feet
Production Hrs. Annual 7,488
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $88,649 1,798,456 kWh $0.05
Electricity Demand $26,426 4,649 kW-months/year $5.68
Electricity Fees $23,546 - $ -
Natural Gas $94,650 14,125 MMBtu $6.70
TOTAL ENERGY COSTS $233,271
RECOMMENDED SAVINGS* $17,818 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$5,625
Cost:
$4,500
- - - - $5,625 875 -
-
kWh
-
-
kW-months/year
$5,625
875
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,618
Cost:
$17,144
$3,215 65,215 $2,403 423 - - $3,215
65,215
kWh
$2,403
423
kW-months/year
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,085
Cost:
$900
$1,561 31,655 $524 92 - - $1,561
31,655
kWh
$524
92
kW-months/year
-
-
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,685
Cost:
$3,000
$(-205) (-4,160) - - $1,890 294 $(-205)
(-4,160)
kWh
-
-
kW-months/year
$1,890
294
MMBtu
05: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$1,724
Cost:
$1,500
- - - - $1,724 268 -
-
kWh
-
-
kW-months/year
$1,724
268
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,081
Cost:
$550
$763 15,469 $318 56 - - $763
15,469
kWh
$318
56
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$17,818
Cost:
$27,594
$5,334 108,179 $3,245 571 $9,239 1,437 $5,334
108,179
kWh
$3,245
571
kW-months/year
$9,239
1,437
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas