IAC logo
IAC Assessment: BD0403
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0403
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2012
Principal Product Metal stampings and weldments
NAICS 332119 - Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469 - Metal Stampings, Nec
Sales $5,000,000-$10,000,000
# of Employees 32
Plant Area (Sq.Ft.) 80,000
Annual Production 0 Units
Production Hrs. Annual 3,484
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $32,076 549,540 kWh $0.06
Electricity Demand $8,152 2,110 kW-months/year $3.86
Electricity Fees $5,999 - $ -
Natural Gas $40,701 4,432 MMBtu $9.18
TOTAL ENERGY COSTS $100,353
RECOMMENDED SAVINGS* $12,330 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,884
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ gal $ $ $ $ $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,988
Cost:
$5,268
$902 16,075 $1,086 282 - - - - - - - - $902
16,075
kWh
$1,086
282
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
Tgal
02: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$1,936
Cost:
$440
$1,407 25,122 $457 118 - - $21 - $51 - - - $1,407
25,122
kWh
$457
118
kW-months/year
-
-
gal
$21
-
$
$51
-
$
-
-
Tgal
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,011
Cost:
$150
$817 14,569 $194 50 - - - - - - - - $817
14,569
kWh
$194
50
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
Tgal
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$756
Cost:
$10
$611 10,897 $145 38 - - - - - - - - $611
10,897
kWh
$145
38
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
Tgal
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$851
Cost:
$450
$665 11,821 $186 48 - - - - - - - - $665
11,821
kWh
$186
48
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
Tgal
06: 3.4151 MINIMIZE WATER USAGE Savings:
$763
Cost:
$1,000
- - - - - - - - - - $763 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
$763
-
Tgal
07: 3.5113 SELL OIL TO RECYCLER Savings:
$515
Cost:
$160
- - - - $515 100 - - - - - - -
-
kWh
-
-
kW-months/year
$515
100
gal
-
-
$
-
-
$
-
-
Tgal
08: 4.447 AUTOMATE PAYROLL SYSTEM Savings:
$4,510
Cost:
$1,500
- - - - - - $4,510 - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$4,510
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$12,330
Cost:
$8,978
$4,402 78,484 $2,068 536 $515 100 $4,531 - $51 - $763 - $4,402
78,484
kWh
$2,068
536
kW-months/year
$515
100
gal
$4,531
-
$
$51
-
$
$763
-
Tgal
TOTAL IMPLEMENTED Savings:
$5,884
Cost:
$7,038
$2,995 53,362 $1,611 418 $515 100 - - - - $763 - $2,995
53,362
kWh
$1,611
418
kW-months/year
$515
100
gal
-
-
$
-
-
$
$763
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Water Consumption