IAC Assessment: BD0404
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2012
Principal Product Canned and bottled beverages
NAICS 312111 - Soft Drink Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $10,000,000-$50,000,000
# of Employees 108
Plant Area (Sq.Ft.) 201,000
Annual Production 360,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $340,936 6,536,197 kWh $0.05
Electricity Demand $61,333 16,713 kW-months/year $3.67
Electricity Fees $2,487 - $ -
Natural Gas $206,881 36,558 MMBtu $5.66
TOTAL ENERGY COSTS $783,551
RECOMMENDED SAVINGS* $124,893 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,901
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$49,969
Cost:
$32,000
- - - - $49,969 8,830 -
-
kWh
-
-
kW-months/year
$49,969
8,830
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$31,392
Cost:
$76,240
$28,404 549,485 $2,988 776 - - $28,404
549,485
kWh
$2,988
776
kW-months/year
-
-
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$28,023
Cost:
$25,000
- - - - $28,023 5,062 -
-
kWh
-
-
kW-months/year
$28,023
5,062
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,130
Cost:
$8,000
$4,130 79,886 - - - - $4,130
79,886
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$6,137
Cost:
$20
$6,137 118,704 - - - - $6,137
118,704
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,573
Cost:
$1,500
$3,125 60,446 $448 116 - - $3,125
60,446
kWh
$448
116
kW-months/year
-
-
MMBtu
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,669
Cost:
$100
- - - - $1,669 254 -
-
kWh
-
-
kW-months/year
$1,669
254
MMBtu
TOTAL RECOMMENDED Savings:
$124,893
Cost:
$142,860
$41,796 808,521 $3,436 892 $79,661 14,146 $41,796
808,521
kWh
$3,436
892
kW-months/year
$79,661
14,146
MMBtu
TOTAL IMPLEMENTED Savings:
$46,901
Cost:
$85,860
$41,796 808,521 $3,436 892 $1,669 254 $41,796
808,521
kWh
$3,436
892
kW-months/year
$1,669
254
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas