IAC logo
IAC Assessment: BD0416
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0416
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2012
Principal Product Hammers, axes, prybars
NAICS 332216 - Saw Blade and Handtool Manufacturing
SIC 3423 - Hand And Edge Tools, Nec
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 163,031
Annual Production 1,500,000 Pieces
Production Hrs. Annual 4,160
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $109,472 3,159,840 kWh $0.03
Electricity Demand $110,038 11,518 kW-months/year $9.55
Natural Gas $242,302 35,928 MMBtu $6.74
TOTAL ENERGY COSTS $461,812
RECOMMENDED SAVINGS* $26,184 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,232
Cost:
$1,766
$1,457 42,118 $775 81 - - - - $1,457
42,118
kWh
$775
81
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,297
Cost:
$17,028
$9,801 283,200 $5,496 574 - - - - $9,801
283,200
kWh
$5,496
574
kW-months/year
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,620
Cost:
$1,000
$786 24,194 $834 82 - - - - $786
24,194
kWh
$834
82
kW-months/year
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,257
Cost:
$700
$736 21,241 $521 54 - - - - $736
21,241
kWh
$521
54
kW-months/year
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$689
Cost:
$10
$403 11,643 $286 30 - - - - $403
11,643
kWh
$286
30
kW-months/year
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$950
Cost:
$1,000
$170 4,376 $780 64 - - - - $170
4,376
kWh
$780
64
kW-months/year
-
-
$
-
-
$
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,653
Cost:
$480
$713 20,615 $940 99 - - - - $713
20,615
kWh
$940
99
kW-months/year
-
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,981
Cost:
$975
$1,253 36,215 $728 76 - - - - $1,253
36,215
kWh
$728
76
kW-months/year
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$505
Cost:
$475
$197 5,659 $74 8 $98 - $136 - $197
5,659
kWh
$74
8
kW-months/year
$98
-
$
$136
-
$
TOTAL RECOMMENDED Savings:
$26,184
Cost:
$23,434
$15,516 449,261 $10,434 1,068 $98 - $136 - $15,516
449,261
kWh
$10,434
1,068
kW-months/year
$98
-
$
$136
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost