IAC logo
IAC Assessment: BD0417
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0417
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2012
Principal Product Aerospace parts
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 135,000
Annual Production 18,500 Pieces
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $162,084 3,020,495 kWh $0.05
Electricity Demand $35,274 6,810 kW-months/year $5.18
Electricity Fees $3,116 - $ -
Natural Gas $22,010 1,779 MMBtu $12.37
TOTAL ENERGY COSTS $228,357
RECOMMENDED SAVINGS* $43,802 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,254
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$661
Cost:
$966
$420 7,828 $240 46 - - $420
7,828
kWh
$240
46
kW-months/year
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$889
Cost:
$10
$750 13,965 $139 27 - - $750
13,965
kWh
$139
27
kW-months/year
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,168
Cost:
$300
$985 18,350 $183 35 - - $985
18,350
kWh
$183
35
kW-months/year
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$38,469
Cost:
$5,000
- - - - $38,469 3,109 -
-
kWh
-
-
kW-months/year
$38,469
3,109
MMBtu
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,301
Cost:
$500
$1,098 20,448 $203 39 - - $1,098
20,448
kWh
$203
39
kW-months/year
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,124
Cost:
$375
$918 17,092 $206 40 - - $918
17,092
kWh
$206
40
kW-months/year
-
-
MMBtu
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$190
Cost:
$50
$144 2,673 $46 9 - - $144
2,673
kWh
$46
9
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$43,802
Cost:
$7,201
$4,315 80,357 $1,017 196 $38,469 3,109 $4,315
80,357
kWh
$1,017
196
kW-months/year
$38,469
3,109
MMBtu
TOTAL IMPLEMENTED Savings:
$40,254
Cost:
$6,341
$1,338 24,920 $446 86 $38,469 3,109 $1,338
24,920
kWh
$446
86
kW-months/year
$38,469
3,109
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas