Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2012 |
Principal Product | Aluminum and Zinc Die Castings |
NAICS | 331523 - Nonferrous Metal Die-Casting Foundries |
SIC | 3363 - Aluminum Die-castings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 65 |
Plant Area (Sq.Ft.) | 85,000 |
Annual Production | 4,300,000 Pounds |
Production Hrs. Annual | 4,680 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $143,480 | 2,117,045 | kWh | $0.07 |
Electricity Demand | $82,698 | 10,025 | kW-months/year | $8.25 |
Electricity Fees | $1,984 | - | $ | - |
Natural Gas | $187,430 | 35,647 | MMBtu | $5.26 |
TOTAL ENERGY COSTS | $415,592 | |||
RECOMMENDED SAVINGS* | $12,117 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $5,714 Cost: $4,000 |
$(-591) | (-8,713) | $(-289) | (-35) | $6,594 | 1,280 | - | - | - | - |
$(-591) (-8,713) kWh |
$(-289) (-35) kW-months/year |
$6,594 1,280 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $2,245 Cost: $3,000 |
- | - | - | - | $2,245 | 434 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,245 434 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,061 Cost: $500 |
$723 | 10,666 | $338 | 41 | - | - | - | - | - | - |
$723 10,666 kWh |
$338 41 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $857 Cost: $2,925 |
$584 | 8,611 | $273 | 33 | - | - | - | - | - | - |
$584 8,611 kWh |
$273 33 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $756 Cost: $2,100 |
$461 | 6,800 | $295 | 36 | - | - | - | - | - | - |
$461 6,800 kWh |
$295 36 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $746 Cost: $20 |
$515 | 7,590 | $231 | 28 | - | - | - | - | - | - |
$515 7,590 kWh |
$231 28 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $608 Cost: $3,000 |
$121 | 1,773 | $487 | 59 | - | - | - | - | - | - |
$121 1,773 kWh |
$487 59 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $130 Cost: $275 |
$35 | 505 | $16 | 2 | - | - | $53 | - | $26 | - |
$35 505 kWh |
$16 2 kW-months/year |
- - MMBtu |
$53 - $ |
$26 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $12,117 Cost: $15,820 |
$1,848 | 27,233 | $1,351 | 164 | $8,839 | 1,713 | $53 | - | $26 | - | $1,848 27,233 kWh |
$1,351 164 kW-months/year |
$8,839 1,713 MMBtu |
$53 - $ |
$26 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |