IAC Assessment: BD0423
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0423
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2013
Principal Product Industrial coatings
NAICS 325510 - Paint and Coating Manufacturing
SIC 2851 - Paints And Allied Products
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 74,225
Annual Production 3,800 Thousand Gallons
Production Hrs. Annual 4,160
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $144,062 3,403,027 kWh $0.04
Electricity Demand $53,541 8,354 kW-months/year $6.41
Electricity Fees $10,023 - $ -
Natural Gas $53,179 10,188 MMBtu $5.22
TOTAL ENERGY COSTS $331,800
RECOMMENDED SAVINGS* $105,956 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,347
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$26,430
Cost:
$2,000
$26,175 614,425 $256 40 - - - - - - $26,175
614,425
kWh
$256
40
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,499
Cost:
$18,273
$9,893 211,383 $2,606 407 - - - - - - $9,893
211,383
kWh
$2,606
407
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$6,135
Cost:
$100,000
$4,700 110,325 $1,435 224 - - - - - - $4,700
110,325
kWh
$1,435
224
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,565
Cost:
$4,565
$3,613 77,194 $952 149 - - - - - - $3,613
77,194
kWh
$952
149
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,616
Cost:
$20
$1,221 20,018 $395 62 - - - - - - $1,221
20,018
kWh
$395
62
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,795
Cost:
$9,000
$3,111 73,033 $684 107 - - - - - - $3,111
73,033
kWh
$684
107
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,404
Cost:
$2,000
- - - - $3,404 652 - - - - -
-
kWh
-
-
kW-months/year
$3,404
652
MMBtu
-
-
lb
-
-
$
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$838
Cost:
$3,250
$(-68) (-1,600) $(-38) (-6) $944 189 - - - - $(-68)
(-1,600)
kWh
$(-38)
(-6)
kW-months/year
$944
189
MMBtu
-
-
lb
-
-
$
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$975
Cost:
$1,500
- - - - $975 156 - - - - -
-
kWh
-
-
kW-months/year
$975
156
MMBtu
-
-
lb
-
-
$
10: 2.1222 INSTALL TURBULATORS Savings:
$543
Cost:
$115
- - - - $543 104 - - - - -
-
kWh
-
-
kW-months/year
$543
104
MMBtu
-
-
lb
-
-
$
11: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$173
Cost:
$250
- - - - $173 35 - - - - -
-
kWh
-
-
kW-months/year
$173
35
MMBtu
-
-
lb
-
-
$
12: 3.8141 REGENERATE CLEANING SOLVENT ON-SITE AND REUSE Savings:
$44,983
Cost:
$302,000
$(-892) (-14,623) - - - - $58,375 326,700 $(-12,500) - $(-892)
(-14,623)
kWh
-
-
kW-months/year
-
-
MMBtu
$58,375
326,700
lb
$(-12,500)
-
$
TOTAL RECOMMENDED Savings:
$105,956
Cost:
$442,973
$47,753 1,090,155 $6,290 981 $6,039 1,135 $58,375 326,700 $(-12,500) - $47,753
1,090,155
kWh
$6,290
981
kW-months/year
$6,039
1,135
MMBtu
$58,375
326,700
lb
$(-12,500)
-
$
TOTAL IMPLEMENTED Savings:
$24,347
Cost:
$124,588
$18,206 398,902 $4,993 779 $1,148 190 - - - - $18,206
398,902
kWh
$4,993
779
kW-months/year
$1,148
190
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes