IAC logo
IAC Assessment: BD0434
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0434
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2013
Principal Product Engineering services
NAICS 541330 - Engineering Services
SIC 8711 - Engineering Services
Sales $500,000-$1,000,000
# of Employees 350
Plant Area (Sq.Ft.) 64,808
Annual Production 0 Units
Production Hrs. Annual 3,120
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $94,944 2,387,428 kWh $0.04
Electricity Demand $37,423 5,951 kW-months/year $6.29
Electricity Fees $8,598 - $ -
Fuel Oil #2 $66,351 2,940 MMBtu $22.57
TOTAL ENERGY COSTS $207,316
RECOMMENDED SAVINGS* $84,028 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $68,525
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$48,621
Cost:
$13,862
- - - - $(-17,730) (-2,468) $66,351 2,940 - - - - -
-
kWh
-
-
kW-months/year
$(-17,730)
(-2,468)
MMBtu
$66,351
2,940
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,169
Cost:
$11,159
$11,981 301,052 $5,188 825 - - - - - - - - $11,981
301,052
kWh
$5,188
825
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$15,503
Cost:
$11,000
$229 5,760 $76 12 - - $15,198 673 - - - - $229
5,760
kWh
$76
12
kW-months/year
-
-
MMBtu
$15,198
673
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,463
Cost:
$1,425
$649 16,311 $140 22 - - - - $282 - $392 - $649
16,311
kWh
$140
22
kW-months/year
-
-
MMBtu
-
-
MMBtu
$282
-
$
$392
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,272
Cost:
$1,475
$1,272 31,955 - - - - - - - - - - $1,272
31,955
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$84,028
Cost:
$38,921
$14,131 355,078 $5,404 859 $(-17,730) (-2,468) $81,549 3,613 $282 - $392 - $14,131
355,078
kWh
$5,404
859
kW-months/year
$(-17,730)
(-2,468)
MMBtu
$81,549
3,613
MMBtu
$282
-
$
$392
-
$
TOTAL IMPLEMENTED Savings:
$68,525
Cost:
$27,921
$13,902 349,318 $5,328 847 $(-17,730) (-2,468) $66,351 2,940 $282 - $392 - $13,902
349,318
kWh
$5,328
847
kW-months/year
$(-17,730)
(-2,468)
MMBtu
$66,351
2,940
MMBtu
$282
-
$
$392
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Personnel Changes Ancillary Material Cost