IAC Assessment: BD0435
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0435
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2013
Principal Product Steel and iron work for repair and construction of locks and dams
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 75,000
Annual Production 0 Units
Production Hrs. Annual 6,240
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,930 1,288,864 kWh $0.04
Electricity Demand $29,986 3,725 kW-months/year $8.05
Electricity Fees $240 - $ -
Natural Gas $8,694 1,210 MMBtu $7.18
LPG $1,062 52 MMBtu $20.31
TOTAL ENERGY COSTS $93,912
RECOMMENDED SAVINGS* $6,879 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,266
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,612
Cost:
$12,980
$1,912 45,752 $1,700 211 - - - - - - $1,912
45,752
kWh
$1,700
211
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,708
Cost:
$500
$533 12,754 $790 98 - - $96 - $289 - $533
12,754
kWh
$790
98
kW-months/year
-
-
MMBtu
$96
-
$
$289
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$654
Cost:
$730
$292 6,990 $77 10 - - $121 - $164 - $292
6,990
kWh
$77
10
kW-months/year
-
-
MMBtu
$121
-
$
$164
-
$
04: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$618
Cost:
$2,100
- - - - $618 87 - - - - -
-
kWh
-
-
kW-months/year
$618
87
MMBtu
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$287
Cost:
$250
$152 3,636 $135 17 - - - - - - $152
3,636
kWh
$135
17
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$6,879
Cost:
$16,560
$2,889 69,132 $2,702 336 $618 87 $217 - $453 - $2,889
69,132
kWh
$2,702
336
kW-months/year
$618
87
MMBtu
$217
-
$
$453
-
$
TOTAL IMPLEMENTED Savings:
$4,266
Cost:
$13,710
$2,204 52,742 $1,777 221 - - $121 - $164 - $2,204
52,742
kWh
$1,777
221
kW-months/year
-
-
MMBtu
$121
-
$
$164
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost