IAC Assessment: BD0441
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0441
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2014
Principal Product Custom engineered product movers
NAICS 333924 - Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
SIC 3537 - Industrial Trucks And Tractors
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 50,444
Annual Production 1,000 Pieces
Production Hrs. Annual 2,340
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $28,383 442,763 kWh $0.06
Electricity Demand $12,160 2,132 kW-months/year $5.70
Electricity Fees $2,439 - $ -
Natural Gas $15,255 2,499 MMBtu $6.10
LPG $2,075 54 MMBtu $38.16
TOTAL ENERGY COSTS $60,312
RECOMMENDED SAVINGS* $16,925 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,280
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$3,813
Cost:
$2,600
$2,619 40,846 $1,194 209 - - - - - - - - $2,619
40,846
kWh
$1,194
209
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$273
Cost:
$450
$237 3,691 $36 6 - - - - - - - - $237
3,691
kWh
$36
6
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$505
Cost:
$20
$347 5,426 $158 28 - - - - - - - - $347
5,426
kWh
$158
28
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$300
Cost:
$280
$171 2,663 $21 4 - - $46 - $62 - - - $171
2,663
kWh
$21
4
kW-months/year
-
-
MMBtu
$46
-
$
$62
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,765
Cost:
$3,000
- - - - $1,765 289 - - - - - - -
-
kWh
-
-
kW-months/year
$1,765
289
MMBtu
-
-
$
-
-
$
-
-
$
06: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$4,867
Cost:
$83
- - - - - - - - $4,867 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$4,867
-
$
-
-
$
07: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$4,000
Cost:
$900
- - - - - - - - - - $4,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$4,000
-
$
08: 4.632 CHANGE OPERATING CONDITIONS Savings:
$1,402
Cost:
$30
- - - - - - - - $1,402 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,402
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$16,925
Cost:
$7,363
$3,374 52,626 $1,409 247 $1,765 289 $46 - $6,331 - $4,000 - $3,374
52,626
kWh
$1,409
247
kW-months/year
$1,765
289
MMBtu
$46
-
$
$6,331
-
$
$4,000
-
$
TOTAL IMPLEMENTED Savings:
$11,280
Cost:
$6,810
$2,790 43,509 $1,215 213 $1,765 289 $46 - $1,464 - $4,000 - $2,790
43,509
kWh
$1,215
213
kW-months/year
$1,765
289
MMBtu
$46
-
$
$1,464
-
$
$4,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost