IAC logo
IAC Assessment: BS0060
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0060
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2015
Principal Product Industrial Gases
NAICS 325120 - Industrial Gas Manufacturing
SIC 2813 - Industrial Gases
Sales $10,000,000-$50,000,000
# of Employees 7
Plant Area (Sq.Ft.) 9,906
Annual Production 11,061 Thousand Gallons
Production Hrs. Annual 8,640
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,307,046 27,970,187 kWh $0.05
Electricity Demand $250,926 41,822 kW-months/year $6.00
Electricity Fees $3,785 - $ -
Natural Gas $1,415 184 MMBtu $7.70
TOTAL ENERGY COSTS $1,563,172
RECOMMENDED SAVINGS* $37,810 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $294
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$674
Cost:
$1,555
$573 12,264 $101 17 - - - - $573
12,264
kWh
$101
17
kW-months/year
-
-
$
-
-
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$8,556
Cost:
$17,382
- - - - $8,556 - - - -
-
kWh
-
-
kW-months/year
$8,556
-
$
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$294
Cost:
$272
$294 6,281 - - - - - - $294
6,281
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,359
Cost:
$2,116
- - - - - - $1,359 184 -
-
kWh
-
-
kW-months/year
-
-
$
$1,359
184
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$479
Cost:
$156
$479 10,259 - - - - - - $479
10,259
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$8,893
Cost:
$26,927
$8,893 190,305 - - - - - - $8,893
190,305
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$11,499
Cost:
$5,813
$30,282 648,000 $450 75 - - $(-19,233) (-2,601) $30,282
648,000
kWh
$450
75
kW-months/year
-
-
$
$(-19,233)
(-2,601)
MMBtu
08: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$6,056
Cost:
$1,870
$6,056 129,600 - - - - - - $6,056
129,600
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$37,810
Cost:
$56,091
$46,577 996,709 $551 92 $8,556 - $(-17,874) (-2,417) $46,577
996,709
kWh
$551
92
kW-months/year
$8,556
-
$
$(-17,874)
(-2,417)
MMBtu
TOTAL IMPLEMENTED Savings:
$294
Cost:
$272
$294 6,281 - - - - - - $294
6,281
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas