Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2015
Principal Product Rock, Sand, Gravel, Concrete, and Asphalt
NAICS 327320 - Ready-Mix Concrete Manufacturing
SIC 3273 - Ready-mixed Concrete
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 9,000,000
Annual Production 1,121,215 Tons
Production Hrs. Annual 2,600
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $188,787 2,612,420 kWh $0.07
Electricity Demand $126,270 17,316 kW-months/year $7.29
Natural Gas $143,931 26,600 MMBtu $5.41
TOTAL ENERGY COSTS $458,988
RECOMMENDED SAVINGS* $16,658 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,828
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,605
Cost:
$74,360
$10,601 147,233 $3,004 412 - - $10,601
147,233
kWh
$3,004
412
kW-months/year
-
-
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,959
Cost:
$5,665
- - - - $1,959 363 -
-
kWh
-
-
kW-months/year
$1,959
363
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$223
Cost:
$702
$196 2,719 $27 4 - - $196
2,719
kWh
$27
4
kW-months/year
-
-
MMBtu
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$871
Cost:
$2,550
$346 4,800 $525 72 - - $346
4,800
kWh
$525
72
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$16,658
Cost:
$83,277
$11,143 154,752 $3,556 488 $1,959 363 $11,143
154,752
kWh
$3,556
488
kW-months/year
$1,959
363
MMBtu
TOTAL IMPLEMENTED Savings:
$13,828
Cost:
$75,062
$10,797 149,952 $3,031 416 - - $10,797
149,952
kWh
$3,031
416
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas