Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2016
Principal Product Corrugated Containers
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2679 - Converted Paper Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 140
Plant Area (Sq.Ft.) 200,000
Annual Production 900,000 Units
Production Hrs. Annual 6,000
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $303,199 6,276,835 kWh $0.05
Electricity Demand $90,078 13,733 kW-months/year $6.56
Electricity Fees $3,785 - $ -
Natural Gas $254,019 66,786 MMBtu $3.80
LPG $46,324 5,122 MMBtu $9.04
TOTAL ENERGY COSTS $697,405
RECOMMENDED SAVINGS* $88,957 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $88,957
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Personnel Changes Administrative Changes Electricity Usage Electricity Demand Water Usage Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ Tgal $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,685
Cost:
$1,464
$6,685 138,398 - - - - - - - - $6,685
138,398
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$513
Cost:
$502
$513 10,619 - - - - - - - - $513
10,619
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$146
Cost:
$52
$146 3,025 - - - - - - - - $146
3,025
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$7,616
Cost:
$3,250
$6,239 129,163 $1,377 210 - - - - - - $6,239
129,163
kWh
$1,377
210
kW-months/year
-
-
Tgal
-
-
$
-
-
$
05: 3.4151 MINIMIZE WATER USAGE Savings:
$256
Cost:
$53
- - - - $256 232 - - - - -
-
kWh
-
-
kW-months/year
$256
232
Tgal
-
-
$
-
-
$
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$73,741
Cost:
$24,334
- - - - - - $(-145,600) - $219,341 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$(-145,600)
-
$
$219,341
-
$
TOTAL RECOMMENDED Savings:
$88,957
Cost:
$29,655
$13,583 281,205 $1,377 210 $256 232 $(-145,600) - $219,341 - $13,583
281,205
kWh
$1,377
210
kW-months/year
$256
232
Tgal
$(-145,600)
-
$
$219,341
-
$
TOTAL IMPLEMENTED Savings:
$88,957
Cost:
$29,655
$13,583 281,205 $1,377 210 $256 232 $(-145,600) - $219,341 - $13,583
281,205
kWh
$1,377
210
kW-months/year
$256
232
Tgal
$(-145,600)
-
$
$219,341
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
Electricity Usage Electricity Demand Water Usage Personnel Changes Administrative Changes Electricity Usage Electricity Demand Water Usage Personnel Changes Administrative Changes