Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Boise State University |
---|---|
Assessment Year | 2016 |
Principal Product | Dimensional Lumber |
NAICS | 321113 - Sawmills |
SIC | 2421 - Sawmills And Planing Mills, General |
Sales | $50,000,000-$100,000,000 |
# of Employees | 72 |
Plant Area (Sq.Ft.) | 85,000 |
Annual Production | 65,000 Thousand Feet |
Production Hrs. Annual | 4,680 |
Location (State) | ID |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $280,439 | 4,584,685 | kWh | $0.06 |
Electricity Demand | $64,839 | 11,588 | kW-months/year | $5.60 |
Wood | $259,584 | 124,800 | MMBtu | $2.08 |
TOTAL ENERGY COSTS | $604,862 | |||
RECOMMENDED SAVINGS* | $22,249 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,261 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Wood | Electricity Usage | Electricity Demand | Wood | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,089 Cost: $4,550 |
$6,031 | 98,548 | $1,058 | 189 | - | - |
$6,031 98,548 kWh |
$1,058 189 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $10,309 Cost: $150 |
$10,309 | 169,005 | - | - | - | - |
$10,309 169,005 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $72 Cost: $311 |
- | - | - | - | $72 | 35 |
- - kWh |
- - kW-months/year |
$72 35 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $3,916 Cost: $80 |
$3,205 | 52,364 | $711 | 127 | - | - |
$3,205 52,364 kWh |
$711 127 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $462 Cost: $15 |
$308 | 5,037 | $154 | 28 | - | - |
$308 5,037 kWh |
$154 28 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $401 Cost: $550 |
$401 | 6,570 | - | - | - | - |
$401 6,570 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $22,249 Cost: $5,656 |
$20,254 | 331,524 | $1,923 | 344 | $72 | 35 | $20,254 331,524 kWh |
$1,923 344 kW-months/year |
$72 35 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,261 Cost: $5,265 |
$17,049 | 279,160 | $1,212 | 217 | - | - | $17,049 279,160 kWh |
$1,212 217 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Wood | Electricity Usage | Electricity Demand | Wood |