IAC logo
IAC Assessment: BS0122
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0122
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2019
Principal Product Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $100,000,000-$500,000,000
# of Employees 185
Plant Area (Sq.Ft.) 5,690,341
Annual Production 256,000 Thousand Feet
Production Hrs. Annual 4,807
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $905,874 27,380,507 kWh $0.03
Electricity Demand $161,835 49,927 kW-months/year $3.24
Natural Gas $237,930 59,286 MMBtu $4.01
TOTAL ENERGY COSTS $1,305,638
RECOMMENDED SAVINGS* $458,837 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,031
Cost:
$14,455
$8,051 243,984 $1,979 609 - - $8,051
243,984
kWh
$1,979
609
kW-months/year
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$13,702
Cost:
$8,000
$4,777 144,759 $8,925 2,746 - - $4,777
144,759
kWh
$8,925
2,746
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,341
Cost:
$1,630
$2,407 72,971 $934 287 - - $2,407
72,971
kWh
$934
287
kW-months/year
-
-
MMBtu
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$882
Cost:
$15
$882 26,710 - - - - $882
26,710
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,219
Cost:
$5,725
$2,219 69,432 - - - - $2,219
69,432
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$105,689
Cost:
$93,600
- - - - $105,689 26,337 -
-
kWh
-
-
kW-months/year
$105,689
26,337
MMBtu
07: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$322,973
Cost:
$1,002,400
$322,973 9,825,508 - - - - $322,973
9,825,508
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$458,837
Cost:
$1,125,825
$341,310 10,383,364 $11,838 3,642 $105,689 26,337 $341,310
10,383,364
kWh
$11,838
3,642
kW-months/year
$105,689
26,337
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas