IAC Assessment: CC0021
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CC0021
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Carolina, Charlotte
Assessment Year 2023
Principal Product micro-optics; glass and silicon wafers
NAICS 333314 - Optical Instrument and Lens Manufacturing
SIC 3827 - Optical Instruments And Lenses
Sales $100,000,000-$500,000,000
# of Employees 50
Plant Area (Sq.Ft.) 100,000
Annual Production 400,000 Units
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $461,066 12,304,652 kWh $0.04
Electricity Demand $240,747 24,969 kW-months/year $9.64
Electricity Fees $741 - $ -
Natural Gas $133,637 12,714 MMBtu $10.51
TOTAL ENERGY COSTS $836,191
RECOMMENDED SAVINGS* $103,378 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$50,657
Cost:
$5,000
$40,459 1,093,485 $10,198 1,058 - - $40,459
1,093,485
kWh
$10,198
1,058
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,378
Cost:
$25,947
$5,444 147,145 $3,934 408 - - $5,444
147,145
kWh
$3,934
408
kW-months/year
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$12,396
Cost:
$15,000
$(-186) (-5,037) $(-67) (-7) $12,649 1,203 $(-186)
(-5,037)
kWh
$(-67)
(-7)
kW-months/year
$12,649
1,203
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,174
Cost:
-
$4,550 122,970 $1,624 168 - - $4,550
122,970
kWh
$1,624
168
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,085
Cost:
$35,000
$8,906 240,705 $3,179 330 - - $8,906
240,705
kWh
$3,179
330
kW-months/year
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,760
Cost:
-
$4,245 114,722 $1,515 157 - - $4,245
114,722
kWh
$1,515
157
kW-months/year
-
-
MMBtu
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$6,928
Cost:
$5,000
$6,928 187,250 - - - - $6,928
187,250
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$103,378
Cost:
$85,947
$70,346 1,901,240 $20,384 2,114 $12,649 1,203 $70,346
1,901,240
kWh
$20,384
2,114
kW-months/year
$12,649
1,203
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas