Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of North Carolina, Charlotte |
---|---|
Assessment Year | 2024 |
Principal Product | brominated flame retardants and plasticizers |
NAICS | 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2869 - Industrial Organic Chemicals, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 30,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $227,536 | 3,710,594 | kWh | $0.06 |
Electricity Demand | $57,690 | 6,952 | kW-months/year | $8.30 |
Electricity Fees | $21,552 | - | $ | - |
Natural Gas | $346,271 | 62,120 | MMBtu | $5.57 |
TOTAL ENERGY COSTS | $653,049 | |||
RECOMMENDED SAVINGS* | $78,747 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $24,323 Cost: $22,680 |
$20,440 | 335,088 | $3,883 | 468 | - | - |
$20,440 335,088 kWh |
$3,883 468 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $14,523 Cost: $8,400 |
$13,001 | 213,138 | $1,522 | 183 | - | - |
$13,001 213,138 kWh |
$1,522 183 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,159 Cost: $1,880 |
$935 | 15,330 | $224 | 27 | - | - |
$935 15,330 kWh |
$224 27 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $4,235 Cost: - |
$3,570 | 58,517 | $665 | 80 | - | - |
$3,570 58,517 kWh |
$665 80 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,282 Cost: $1,000 |
$1,924 | 31,536 | $358 | 43 | - | - |
$1,924 31,536 kWh |
$358 43 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,010 Cost: $2,500 |
- | - | - | - | $1,010 | 181 |
- - kWh |
- - kW-months/year |
$1,010 181 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $11,158 Cost: $17,000 |
$9,405 | 154,176 | $1,753 | 211 | - | - |
$9,405 154,176 kWh |
$1,753 211 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $2,800 Cost: - |
- | - | - | - | $2,800 | 502 |
- - kWh |
- - kW-months/year |
$2,800 502 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $17,257 Cost: $183,891 |
$17,257 | 282,899 | - | - | - | - |
$17,257 282,899 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $78,747 Cost: $237,351 |
$66,532 | 1,090,684 | $8,405 | 1,013 | $3,810 | 684 | $66,532 1,090,684 kWh |
$8,405 1,013 kW-months/year |
$3,810 684 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |