IAC logo
IAC Assessment: CI0031
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CI0031
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of California, Irvine
Assessment Year 2024
Principal Product Wine
NAICS 312130 - Wineries
SIC 2084 - Wines, Brandy, And Brandy Spirits
Sales $1,000,000-$5,000,000
# of Employees 7
Plant Area (Sq.Ft.) 17,700
Annual Production 40,000 Pieces
Production Hrs. Annual 1,530
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $167,714 1,150,394 kWh $0.15
Electricity Demand $26,515 1,251 kW-months/year $21.20
Electricity Fees $2,326 - $ -
LPG $8,330 284 MMBtu $29.34
TOTAL ENERGY COSTS $204,885
RECOMMENDED SAVINGS* $90,470 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG
$ kWh $ kW-months/year $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$37,344
Cost:
$306,517
$31,536 216,295 $5,808 274 - - $31,536
216,295
kWh
$5,808
274
kW-months/year
-
-
MMBtu
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$25,325
Cost:
$20,000
$25,325 173,694 - - - - $25,325
173,694
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.3112 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS Savings:
$8,942
Cost:
$30,000
- - $8,942 422 - - -
-
kWh
$8,942
422
kW-months/year
-
-
MMBtu
04: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$8,940
Cost:
$67,000
$8,940 61,320 - - - - $8,940
61,320
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION Savings:
$2,757
Cost:
$20,000
$(-3,009) (-20,639) $(-2,564) (-121) $8,330 284 $(-3,009)
(-20,639)
kWh
$(-2,564)
(-121)
kW-months/year
$8,330
284
MMBtu
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$2,563
Cost:
$100
- - $2,563 121 - - -
-
kWh
$2,563
121
kW-months/year
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,443
Cost:
$1,800
$1,435 9,838 $1,008 48 - - $1,435
9,838
kWh
$1,008
48
kW-months/year
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,321
Cost:
$1,928
$776 5,321 $545 26 - - $776
5,321
kWh
$545
26
kW-months/year
-
-
MMBtu
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$835
Cost:
$400
$574 3,937 $261 12 - - $574
3,937
kWh
$261
12
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$90,470
Cost:
$447,745
$65,577 449,766 $16,563 782 $8,330 284 $65,577
449,766
kWh
$16,563
782
kW-months/year
$8,330
284
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG