IAC Assessment: CI0034
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CI0034
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of California, Irvine
Assessment Year 2024
Principal Product Office Facility
NAICS 541330 - Engineering Services
SIC 8711 - Engineering Services
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 426,000
Annual Production 100,000 Units
Production Hrs. Annual 2,500
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $426,779 8,265,498 kWh $0.05
Electricity Demand $211,471 14,643 kW-months/year $14.44
Electricity Fees $101,209 - $ -
Natural Gas $28,767 6,334 MMBtu $4.54
TOTAL ENERGY COSTS $778,707
RECOMMENDED SAVINGS* $540,397 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$460,108
Cost:
$5,410,149
$305,103 5,912,843 $155,005 10,734 - - $305,103
5,912,843
kWh
$155,005
10,734
kW-months/year
-
-
$
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$21,158
Cost:
$11,650
$9,732 188,599 $11,426 791 - - $9,732
188,599
kWh
$11,426
791
kW-months/year
-
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$19,192
Cost:
$63,000
$19,192 371,947 - - - - $19,192
371,947
kWh
-
-
kW-months/year
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$12,048
Cost:
-
$6,650 128,880 $5,398 374 - - $6,650
128,880
kWh
$5,398
374
kW-months/year
-
-
$
05: 2.7262 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS Savings:
$7,514
Cost:
$7,600
$7,514 145,620 - - - - $7,514
145,620
kWh
-
-
kW-months/year
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,472
Cost:
$3,000
$3,427 66,424 $3,879 269 $166 - $3,427
66,424
kWh
$3,879
269
kW-months/year
$166
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,253
Cost:
$2,500
$4,520 87,600 $1,733 120 - - $4,520
87,600
kWh
$1,733
120
kW-months/year
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,986
Cost:
$375
$2,790 54,078 $1,196 83 - - $2,790
54,078
kWh
$1,196
83
kW-months/year
-
-
$
09: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,693
Cost:
$45
- - $1,693 114 - - -
-
kWh
$1,693
114
kW-months/year
-
-
$
10: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$973
Cost:
$6,000
$973 18,850 - - - - $973
18,850
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$540,397
Cost:
$5,504,319
$359,901 6,974,841 $180,330 12,484 $166 - $359,901
6,974,841
kWh
$180,330
12,484
kW-months/year
$166
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes