IAC logo
IAC Assessment: CI0038
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CI0038
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of California, Irvine
Assessment Year 2024
Principal Product Beer/Malt Beverages
NAICS 312120 - Breweries
SIC 2082 - Malt Beverages
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 23,328
Annual Production 5,000 BBL
Production Hrs. Annual 3,900
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,512 300,192 kWh $0.21
Electricity Demand $15,719 1,763 kW-months/year $8.92
Electricity Fees $7,362 - $ -
Natural Gas $21,963 1,905 MMBtu $11.53
Other Gas $4,220 1 MMBtu $4,220.00
TOTAL ENERGY COSTS $122,244
RECOMMENDED SAVINGS* $115,367 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$57,768
Cost:
$242,254
$54,849 263,445 $2,919 328 - - - - - - $54,849
263,445
kWh
$2,919
328
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$28,800
Cost:
$10,000
$28,800 138,330 - - - - - - - - $28,800
138,330
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,400
Cost:
$1,000
$8,304 39,886 $1,096 123 - - - - - - $8,304
39,886
kWh
$1,096
123
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$8,867
Cost:
$17,866
$8,867 42,592 - - - - - - - - $8,867
42,592
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$4,714
Cost:
$1,500
$3,652 17,540 $902 101 - - $10 - $150 - $3,652
17,540
kWh
$902
101
kW-months/year
-
-
MMBtu
$10
-
$
$150
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,690
Cost:
$1,100
$2,377 11,419 $313 35 - - - - - - $2,377
11,419
kWh
$313
35
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,786
Cost:
$792
$1,578 7,581 $208 23 - - - - - - $1,578
7,581
kWh
$208
23
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$765
Cost:
$3,000
- - - - $765 66 - - - - -
-
kWh
-
-
kW-months/year
$765
66
MMBtu
-
-
$
-
-
$
09: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$577
Cost:
$150
- - $577 65 - - - - - - -
-
kWh
$577
65
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$115,367
Cost:
$277,662
$108,427 520,793 $6,015 675 $765 66 $10 - $150 - $108,427
520,793
kWh
$6,015
675
kW-months/year
$765
66
MMBtu
$10
-
$
$150
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost