IAC Assessment: CI0041
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of California, Irvine
Assessment Year 2024
Principal Product Powder Metallurgy
NAICS 332117 - Powder Metallurgy Part Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 23
Plant Area (Sq.Ft.) 70,000
Annual Production 1,000,000 Units
Production Hrs. Annual 4,420
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,108 556,274 kWh $0.13
Electricity Demand $47,116 3,359 kW-months/year $14.03
Electricity Fees $2,464 - $ -
Natural Gas $30,524 2,779 MMBtu $10.98
Other Gas $4,334 1 MMBtu $4,334.00
Other Energy $349,950 1 MMBtu $349,950.00
TOTAL ENERGY COSTS $506,674
RECOMMENDED SAVINGS* $469,956 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Energy Electricity Usage Electricity Demand Other Energy
$ kWh $ kW-months/year $ MMBtu
01: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$349,950
Cost:
$1,386,072
- - - - $349,950 1 -
-
kWh
-
-
kW-months/year
$349,950
1
MMBtu
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$35,660
Cost:
$280,607
$26,936 213,774 $8,724 622 - - $26,936
213,774
kWh
$8,724
622
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$24,870
Cost:
$5,200
$21,604 171,460 $3,266 233 - - $21,604
171,460
kWh
$3,266
233
kW-months/year
-
-
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$19,096
Cost:
$20,568
$14,648 116,250 $4,448 317 - - $14,648
116,250
kWh
$4,448
317
kW-months/year
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$17,211
Cost:
$5,150
$17,211 136,600 - - - - $17,211
136,600
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$16,338
Cost:
$9,000
$7,718 61,251 $8,620 614 - - $7,718
61,251
kWh
$8,620
614
kW-months/year
-
-
MMBtu
07: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$3,571
Cost:
$40
- - $3,571 255 - - -
-
kWh
$3,571
255
kW-months/year
-
-
MMBtu
08: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,103
Cost:
$2,000
$2,103 16,688 - - - - $2,103
16,688
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,157
Cost:
$2,000
$764 6,061 $393 28 - - $764
6,061
kWh
$393
28
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$469,956
Cost:
$1,710,637
$90,984 722,084 $29,022 2,069 $349,950 1 $90,984
722,084
kWh
$29,022
2,069
kW-months/year
$349,950
1
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Other Energy Electricity Usage Electricity Demand Other Energy