IAC logo
IAC Assessment: CL1904
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CL1904
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Clemson University
Assessment Year 2019
Principal Product Boats, fiberglass center console
NAICS 336612 - Boat Building
SIC 3732 - Boat Building And Repairing
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 200,000
Annual Production 850 Pieces
Production Hrs. Annual 2,000
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $162,671 1,833,648 kWh $0.09
Electricity Fees $466 - $ -
Fuel Oil #1 $10,758 5,242 MMBtu $2.05
TOTAL ENERGY COSTS $180,127
RECOMMENDED SAVINGS* $51,442 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,442
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #1 Electricity Usage Fuel Oil #1
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$35,719
Cost:
$44,796
$35,719 396,876 - - $35,719
396,876
kWh
-
-
MMBtu
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$2,689
Cost:
-
- - $2,689 1,092 -
-
kWh
$2,689
1,092
MMBtu
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$13,034
Cost:
$38,500
$13,034 144,825 - - $13,034
144,825
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$51,442
Cost:
$83,296
$48,753 541,701 $2,689 1,092 $48,753
541,701
kWh
$2,689
1,092
MMBtu
TOTAL IMPLEMENTED Savings:
$51,442
Cost:
$83,296
$48,753 541,701 $2,689 1,092 $48,753
541,701
kWh
$2,689
1,092
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #1 Electricity Usage Fuel Oil #1