Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Clemson University |
---|---|
Assessment Year | 2019 |
Principal Product | API )Active Phamaceutical Ingredients) |
NAICS | 325412 - Pharmaceutical Preparation Manufacturing |
SIC | 2834 - Pharmaceutical Preparations |
Sales | $10,000,000-$50,000,000 |
# of Employees | 125 |
Plant Area (Sq.Ft.) | 72,650 |
Annual Production | 22,000 Pounds |
Production Hrs. Annual | 4,500 |
Location (State) | SC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $344,751 | 7,807,814 | kWh | $0.04 |
Electricity Demand | $185,264 | 16,924 | kW-months/year | $10.95 |
Electricity Fees | $7,049 | - | $ | - |
Natural Gas | $211,378 | 34,398 | MMBtu | $6.15 |
Other Energy | $3,542 | 430 | MMBtu | $8.24 |
TOTAL ENERGY COSTS | $1,852,359 | |||
RECOMMENDED SAVINGS* | $167,881 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,160 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Energy | Other Liquid (haz) | Administrative Changes | Electricity Usage | Electricity Demand | Other Energy | Other Liquid (haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $17,417 Cost: $15,294 |
$12,249 | 278,385 | $5,168 | 472 | - | - | - | - | - | - |
$12,249 278,385 kWh |
$5,168 472 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $3,542 Cost: $2,040 |
- | - | - | - | $3,542 | 430 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,542 430 MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $647 Cost: $2,080 |
$389 | 8,842 | $258 | 24 | - | - | - | - | - | - |
$389 8,842 kWh |
$258 24 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $2,971 Cost: - |
- | - | - | - | - | - | - | - | $2,971 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$2,971 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $143,304 Cost: $600 |
- | - | - | - | - | - | $143,304 | 1 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$143,304 1 gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $167,881 Cost: $20,014 |
$12,638 | 287,227 | $5,426 | 496 | $3,542 | 430 | $143,304 | 1 | $2,971 | - | $12,638 287,227 kWh |
$5,426 496 kW-months/year |
$3,542 430 MMBtu |
$143,304 1 gal |
$2,971 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,160 Cost: $4,120 |
$389 | 8,842 | $258 | 24 | $3,542 | 430 | - | - | $2,971 | - | $389 8,842 kWh |
$258 24 kW-months/year |
$3,542 430 MMBtu |
- - gal |
$2,971 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Energy | Other Liquid (haz) | Administrative Changes | Electricity Usage | Electricity Demand | Other Energy | Other Liquid (haz) | Administrative Changes |