IAC Assessment: CL1912
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CL1912
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Clemson University
Assessment Year 2019
Principal Product Hot Mix Asphalt
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 250,000
Annual Production 235,000 Tons
Production Hrs. Annual 3,000
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $90,865 855,574 kWh $0.11
Electricity Fees $103 - $ -
Natural Gas $289,690 61,190 MMBtu $4.73
TOTAL ENERGY COSTS $380,658
RECOMMENDED SAVINGS* $10,459 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,459
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Water Usage Electricity Usage Electricity Fees Natural Gas Water Usage
$ kWh $ $ $ MMBtu $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,757
Cost:
$4,162
$3,757 35,447 - - - - - - $3,757
35,447
kWh
-
-
$
-
-
MMBtu
-
-
Tgal
02: 3.4151 MINIMIZE WATER USAGE Savings:
$1,166
Cost:
$1,750
- - - - - - $1,166 259 -
-
kWh
-
-
$
-
-
MMBtu
$1,166
259
Tgal
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,433
Cost:
$15,806
- - - - $5,433 1,149 - - -
-
kWh
-
-
$
$5,433
1,149
MMBtu
-
-
Tgal
04: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$103
Cost:
-
- - $103 - - - - - -
-
kWh
$103
-
$
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$10,459
Cost:
$21,718
$3,757 35,447 $103 - $5,433 1,149 $1,166 259 $3,757
35,447
kWh
$103
-
$
$5,433
1,149
MMBtu
$1,166
259
Tgal
TOTAL IMPLEMENTED Savings:
$10,459
Cost:
$21,718
$3,757 35,447 $103 - $5,433 1,149 $1,166 259 $3,757
35,447
kWh
$103
-
$
$5,433
1,149
MMBtu
$1,166
259
Tgal
Savings
Cost
$ kWh $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Fees Natural Gas Water Usage Electricity Usage Electricity Fees Natural Gas Water Usage