IAC logo
IAC Assessment: CL1913
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CL1913
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Clemson University
Assessment Year 2019
Principal Product Clean Water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 25
Plant Area (Sq.Ft.) 25,000
Annual Production 1,000,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $412,568 5,532,500 kWh $0.07
Electricity Demand $110,852 12,348 kW-months/year $8.98
Electricity Fees $7,394 - $ -
TOTAL ENERGY COSTS $530,815
RECOMMENDED SAVINGS* $305,922 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,508
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$23,521
Cost:
$22,682
$17,192 229,221 $6,329 705 $17,192
229,221
kWh
$6,329
705
kW-months/year
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$22,987
Cost:
$32,413
$17,312 230,825 $5,675 632 $17,312
230,825
kWh
$5,675
632
kW-months/year
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$4,338
Cost:
$12,000
$4,338 57,840 - - $4,338
57,840
kWh
-
-
kW-months/year
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$162,118
Cost:
$350,000
$139,275 1,857,000 $22,843 2,543 $139,275
1,857,000
kWh
$22,843
2,543
kW-months/year
05: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$92,958
Cost:
$400,000
$79,860 1,064,795 $13,098 1,459 $79,860
1,064,795
kWh
$13,098
1,459
kW-months/year
TOTAL RECOMMENDED Savings:
$305,922
Cost:
$817,095
$257,977 3,439,681 $47,945 5,339 $257,977
3,439,681
kWh
$47,945
5,339
kW-months/year
TOTAL IMPLEMENTED Savings:
$46,508
Cost:
$55,095
$34,504 460,046 $12,004 1,337 $34,504
460,046
kWh
$12,004
1,337
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand