IAC logo
IAC Assessment: CL1914
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CL1914
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Clemson University
Assessment Year 2019
Principal Product Muffins, cookies, frozen dough
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 425
Plant Area (Sq.Ft.) 212,000
Annual Production 240,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $935,272 19,358,612 kWh $0.05
Electricity Demand $543,948 43,200 kW-months/year $12.59
Electricity Fees $20,765 - $ -
Natural Gas $88,836 20,111 MMBtu $4.42
TOTAL ENERGY COSTS $1,588,821
RECOMMENDED SAVINGS* $22,242 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,622
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,145
Cost:
$2,800
$2,314 46,267 $831 66 $2,314
46,267
kWh
$831
66
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,477
Cost:
$30,884
$9,147 182,933 $7,330 582 $9,147
182,933
kWh
$7,330
582
kW-months/year
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,620
Cost:
-
$1,927 38,546 $693 55 $1,927
38,546
kWh
$693
55
kW-months/year
TOTAL RECOMMENDED Savings:
$22,242
Cost:
$33,684
$13,388 267,746 $8,854 703 $13,388
267,746
kWh
$8,854
703
kW-months/year
TOTAL IMPLEMENTED Savings:
$19,622
Cost:
$33,684
$11,461 229,200 $8,161 648 $11,461
229,200
kWh
$8,161
648
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand