IAC Assessment: CL2002
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CL2002
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Clemson University
Assessment Year 2020
Principal Product Treated waste water
NAICS 562219 - Other Nonhazardous Waste Treatment and Disposal
SIC 4953 - Refuse Systems
Sales $1,000,000-$5,000,000
# of Employees 20
Plant Area (Sq.Ft.) 250,000
Annual Production 5,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $502,755 10,316,495 kWh $0.05
Electricity Demand $218,445 20,393 kW-months/year $10.71
Electricity Fees $1,126 - $ -
Natural Gas $4,940 5,723 MMBtu $0.86
TOTAL ENERGY COSTS $727,267
RECOMMENDED SAVINGS* $126,298 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $126,298
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,753
Cost:
$16,667
$3,195 65,207 $3,558 332 $3,195
65,207
kWh
$3,558
332
kW-months/year
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$70,362
Cost:
$136,200
$54,149 1,105,074 $16,213 1,514 $54,149
1,105,074
kWh
$16,213
1,514
kW-months/year
03: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$49,183
Cost:
$300,000
$37,850 772,453 $11,333 1,058 $37,850
772,453
kWh
$11,333
1,058
kW-months/year
TOTAL RECOMMENDED Savings:
$126,298
Cost:
$452,867
$95,194 1,942,734 $31,104 2,904 $95,194
1,942,734
kWh
$31,104
2,904
kW-months/year
TOTAL IMPLEMENTED Savings:
$126,298
Cost:
$452,867
$95,194 1,942,734 $31,104 2,904 $95,194
1,942,734
kWh
$31,104
2,904
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand