IAC Assessment: CL2010
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CL2010
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Clemson University
Assessment Year 2020
Principal Product High quality Potable Water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $50,000,000-$100,000,000
# of Employees 30
Plant Area (Sq.Ft.) 92,000
Annual Production 15,000,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $398,287 8,822,280 kWh $0.05
Electricity Demand $167,051 19,331 kW-months/year $8.64
Electricity Fees $2,909 - $ -
LPG $60,000 12,000 MMBtu $5.00
TOTAL ENERGY COSTS $648,248
RECOMMENDED SAVINGS* $145,551 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $145,551
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,534
Cost:
$13,514
$11,594 256,810 $3,940 456 - - $11,594
256,810
kWh
$3,940
456
kW-months/year
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,084
Cost:
$656
$1,084 24,011 - - - - $1,084
24,011
kWh
-
-
kW-months/year
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$114,467
Cost:
$157,000
$61,614 1,364,795 $52,852 6,116 - - $61,614
1,364,795
kWh
$52,852
6,116
kW-months/year
-
-
$
04: 4.463 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS Savings:
$14,466
Cost:
$4,500
- - - - $14,466 - -
-
kWh
-
-
kW-months/year
$14,466
-
$
TOTAL RECOMMENDED Savings:
$145,551
Cost:
$175,670
$74,292 1,645,616 $56,792 6,572 $14,466 - $74,292
1,645,616
kWh
$56,792
6,572
kW-months/year
$14,466
-
$
TOTAL IMPLEMENTED Savings:
$145,551
Cost:
$175,670
$74,292 1,645,616 $56,792 6,572 $14,466 - $74,292
1,645,616
kWh
$56,792
6,572
kW-months/year
$14,466
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes