IAC logo
IAC Assessment: CL2110
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CL2110
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Clemson University
Assessment Year 2021
Principal Product Railroad Products
NAICS 336370 - Motor Vehicle Metal Stamping
SIC 3465 - Automotive Stampings
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 270,000
Annual Production 100,000 Pieces
Production Hrs. Annual 6,024
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $578,082 9,009,600 kWh $0.06
Electricity Demand $1 21,360 kW-months/year $0.00
Electricity Fees $27,023 - $ -
Natural Gas $3,980 304,826 MMBtu $0.01
LPG $28,477 23,135 MMBtu $1.23
TOTAL ENERGY COSTS $643,451
RECOMMENDED SAVINGS* $58,250 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,493
Cost:
$18,147
$16,493 257,050 $16,493
257,050
kWh
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,721
Cost:
$4,908
$5,721 95,343 $5,721
95,343
kWh
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$295
Cost:
$60
$295 4,599 $295
4,599
kWh
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$607
Cost:
-
$607 10,113 $607
10,113
kWh
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,104
Cost:
-
$5,104 85,069 $5,104
85,069
kWh
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$22,030
Cost:
-
$22,030 367,162 $22,030
367,162
kWh
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$8,000
Cost:
-
$8,000 - $8,000
-
kWh
TOTAL RECOMMENDED Savings:
$58,250
Cost:
$23,115
$58,250 819,336 $58,250
819,336
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh