IAC logo
IAC Assessment: CM1002
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CM1002
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado School of Mines
Assessment Year 2022
Principal Product Educational Services
NAICS 611210 - Junior Colleges
SIC 8222 - Junior Colleges
Sales $1,000,000-$5,000,000
# of Employees 424
Plant Area (Sq.Ft.) 100,000
Annual Production 2,000 Units
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $220,982 5,181,696 kWh $0.04
Electricity Demand $171,386 9,558 kW-months/year $17.93
Electricity Fees $4,152 - $ -
Natural Gas $102,780 16,800 MMBtu $6.12
TOTAL ENERGY COSTS $499,300
RECOMMENDED SAVINGS* $73,233 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,003
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,003
Cost:
$44,000
$6,729 160,300 $5,274 380 - - $6,729
160,300
kWh
$5,274
380
kW-months/year
-
-
MMBtu
02: 2.7493 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES Savings:
$1,800
Cost:
$100,000
$600 15,800 $700 39 $500 64 $600
15,800
kWh
$700
39
kW-months/year
$500
64
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$410
Cost:
$4,100
$240 5,500 $170 7 - - $240
5,500
kWh
$170
7
kW-months/year
-
-
MMBtu
04: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$4,300
Cost:
$3,000
- - - - $4,300 530 -
-
kWh
-
-
kW-months/year
$4,300
530
MMBtu
05: 2.7314 REDUCE VENTILATION AIR Savings:
$21,000
Cost:
$740,000
$9,000 324,000 $12,000 612 - - $9,000
324,000
kWh
$12,000
612
kW-months/year
-
-
MMBtu
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$32,600
Cost:
$850,000
$32,600 358,000 - - - - $32,600
358,000
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$220
Cost:
$860
$220 6,800 - - - - $220
6,800
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$900
Cost:
$1,200
$500 14,000 $400 33 - - $500
14,000
kWh
$400
33
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$73,233
Cost:
$1,743,160
$49,889 884,400 $18,544 1,071 $4,800 594 $49,889
884,400
kWh
$18,544
1,071
kW-months/year
$4,800
594
MMBtu
TOTAL IMPLEMENTED Savings:
$33,003
Cost:
$784,000
$15,729 484,300 $17,274 992 - - $15,729
484,300
kWh
$17,274
992
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas