IAC logo
IAC Assessment: CO0006
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0006
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1984
Principal Product FABRICATED STEEL
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 0
Annual Production 7,000 Tons
Production Hrs. Annual 4,000
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $19,434 284,291 kWh $0.07
Natural Gas $9,973 2,044 MMBtu $4.88
TOTAL ENERGY COSTS $29,407
RECOMMENDED SAVINGS* $5,272 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,564
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$350
Cost:
$300
$350 5,275 - - $350
5,275
kWh
-
-
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$105
Cost:
$300
- - $105 21 -
-
kWh
$105
21
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$356
Cost:
$20
$356 5,275 - - $356
5,275
kWh
-
-
MMBtu
04: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$820
Cost:
$1,939
- - $820 168 -
-
kWh
$820
168
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$288
Cost:
$150
- - $288 59 -
-
kWh
$288
59
MMBtu
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,708
Cost:
$5,000
$2,708 29,601 - - $2,708
29,601
kWh
-
-
MMBtu
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$347
Cost:
$125
$86 2,638 $261 54 $86
2,638
kWh
$261
54
MMBtu
08: 2.3521 REDUCE LOAD ON ELECTRICAL CONDUCTOR TO REDUCE HEATING LOSSES Savings:
$134
Cost:
$200
$134 2,052 - - $134
2,052
kWh
-
-
MMBtu
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$164
Cost:
$60
$164 2,345 - - $164
2,345
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$5,272
Cost:
$8,094
$3,798 47,186 $1,474 302 $3,798
47,186
kWh
$1,474
302
MMBtu
TOTAL IMPLEMENTED Savings:
$2,564
Cost:
$3,094
$1,090 17,585 $1,474 302 $1,090
17,585
kWh
$1,474
302
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas