IAC logo
IAC Assessment: CO0020
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0020
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1985
Principal Product NEWSPAPERS
NAICS n/a
SIC 2711 - Newspapers
Sales $5,000,000-$10,000,000
# of Employees 140
Plant Area (Sq.Ft.) 0
Annual Production 9,000,000 Pieces
Production Hrs. Annual 4,056
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $63,013 827,374 kWh $0.08
Natural Gas $13,285 2,433 MMBtu $5.46
TOTAL ENERGY COSTS $76,298
RECOMMENDED SAVINGS* $14,200 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,095
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,993
Cost:
$2,632
$5,993 78,839 - - $5,993
78,839
kWh
-
-
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,084
Cost:
$350
- - $2,084 382 -
-
kWh
$2,084
382
MMBtu
03: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$689
Cost:
$450
- - $689 126 -
-
kWh
$689
126
MMBtu
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,378
Cost:
$1,800
$1,378 - - - $1,378
-
kWh
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,105
Cost:
$420
$882 11,723 $1,223 224 $882
11,723
kWh
$1,223
224
MMBtu
06: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$1,951
Cost:
$4,000
$1,951 25,498 - - $1,951
25,498
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$14,200
Cost:
$9,652
$10,204 116,060 $3,996 732 $10,204
116,060
kWh
$3,996
732
MMBtu
TOTAL IMPLEMENTED Savings:
$12,095
Cost:
$9,232
$9,322 104,337 $2,773 508 $9,322
104,337
kWh
$2,773
508
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas