IAC Assessment: CO0021
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0021
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1985
Principal Product WIRE BELTS & CHAINS
NAICS n/a
SIC 3496 - Misc. Fabricated Wire Products
Sales $1,000,000-$5,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 5,000,000 Pieces
Production Hrs. Annual 2,470
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $98,841 718,933 kWh $0.14
Natural Gas $59,963 12,636 MMBtu $4.75
TOTAL ENERGY COSTS $158,804
RECOMMENDED SAVINGS* $9,956 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,049
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$474
Cost:
$219
$474 7,327 - - - - $474
7,327
kWh
-
-
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$440
Cost:
$500
- - $440 93 - - -
-
kWh
$440
93
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$811
Cost:
$200
- - $811 171 - - -
-
kWh
$811
171
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$149
Cost:
$200
- - $149 31 - - -
-
kWh
$149
31
MMBtu
-
-
$
05: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$2,675
Cost:
-
$7,675 - - - $(-5,000) - $7,675
-
kWh
-
-
MMBtu
$(-5,000)
-
$
06: 2.3521 REDUCE LOAD ON ELECTRICAL CONDUCTOR TO REDUCE HEATING LOSSES Savings:
$3,907
Cost:
$1,000
$3,907 61,254 - - - - $3,907
61,254
kWh
-
-
MMBtu
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$532
Cost:
$500
- - $532 112 - - -
-
kWh
$532
112
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$327
Cost:
$50
$327 5,275 - - - - $327
5,275
kWh
-
-
MMBtu
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$174
Cost:
$100
$174 2,638 - - - - $174
2,638
kWh
-
-
MMBtu
-
-
$
10: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$467
Cost:
$100
$467 7,327 - - - - $467
7,327
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$9,956
Cost:
$2,869
$13,024 83,821 $1,932 407 $(-5,000) - $13,024
83,821
kWh
$1,932
407
MMBtu
$(-5,000)
-
$
TOTAL IMPLEMENTED Savings:
$6,049
Cost:
$1,869
$9,117 22,567 $1,932 407 $(-5,000) - $9,117
22,567
kWh
$1,932
407
MMBtu
$(-5,000)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes