Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1985 |
Principal Product | WIRE BELTS & CHAINS |
NAICS | n/a |
SIC | 3496 - Misc. Fabricated Wire Products |
Sales | $1,000,000-$5,000,000 |
# of Employees | 75 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 5,000,000 Pieces |
Production Hrs. Annual | 2,470 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $98,841 | 718,933 | kWh | $0.14 |
Natural Gas | $59,963 | 12,636 | MMBtu | $4.75 |
TOTAL ENERGY COSTS | $158,804 | |||
RECOMMENDED SAVINGS* | $9,956 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,049 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $474 Cost: $219 |
$474 | 7,327 | - | - | - | - |
$474 7,327 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $440 Cost: $500 |
- | - | $440 | 93 | - | - |
- - kWh |
$440 93 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $811 Cost: $200 |
- | - | $811 | 171 | - | - |
- - kWh |
$811 171 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $149 Cost: $200 |
- | - | $149 | 31 | - | - |
- - kWh |
$149 31 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION |
Savings: $2,675 Cost: - |
$7,675 | - | - | - | $(-5,000) | - |
$7,675 - kWh |
- - MMBtu |
$(-5,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3521 REDUCE LOAD ON ELECTRICAL CONDUCTOR TO REDUCE HEATING LOSSES |
Savings: $3,907 Cost: $1,000 |
$3,907 | 61,254 | - | - | - | - |
$3,907 61,254 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $532 Cost: $500 |
- | - | $532 | 112 | - | - |
- - kWh |
$532 112 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $327 Cost: $50 |
$327 | 5,275 | - | - | - | - |
$327 5,275 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $174 Cost: $100 |
$174 | 2,638 | - | - | - | - |
$174 2,638 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $467 Cost: $100 |
$467 | 7,327 | - | - | - | - |
$467 7,327 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $9,956 Cost: $2,869 |
$13,024 | 83,821 | $1,932 | 407 | $(-5,000) | - | $13,024 83,821 kWh |
$1,932 407 MMBtu |
$(-5,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,049 Cost: $1,869 |
$9,117 | 22,567 | $1,932 | 407 | $(-5,000) | - | $9,117 22,567 kWh |
$1,932 407 MMBtu |
$(-5,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |