IAC Assessment: CO0032
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0032
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1985
Principal Product POLYURETHANE CASTER WHEELS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 0
Annual Production 300,000 Pounds
Production Hrs. Annual 2,444
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,847 793,083 kWh $0.06
Natural Gas $10,117 2,108 MMBtu $4.80
TOTAL ENERGY COSTS $57,964
RECOMMENDED SAVINGS* $18,533 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,249
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$816
Cost:
$500
- - $816 170 -
-
kWh
$816
170
MMBtu
02: 2.7262 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS Savings:
$816
Cost:
$2,000
$816 13,482 - - $816
13,482
kWh
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,062
Cost:
$596
$1,210 19,930 $2,852 594 $1,210
19,930
kWh
$2,852
594
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$8,406
Cost:
-
$13,727 227,433 $(-5,321) (-1,109) $13,727
227,433
kWh
$(-5,321)
(-1,109)
MMBtu
05: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,972
Cost:
$3,600
$2,972 - - - $2,972
-
kWh
-
-
MMBtu
06: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$596
Cost:
$1,500
- - $596 124 -
-
kWh
$596
124
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$865
Cost:
$1,500
$865 14,361 - - $865
14,361
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$18,533
Cost:
$9,696
$19,590 275,206 $(-1,057) (-221) $19,590
275,206
kWh
$(-1,057)
(-221)
MMBtu
TOTAL IMPLEMENTED Savings:
$5,249
Cost:
$8,600
$4,653 27,843 $596 124 $4,653
27,843
kWh
$596
124
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas