IAC Assessment: CO0040
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0040
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1985
Principal Product STAINLESS STEEL FOOD EQUIPMENT
NAICS n/a
SIC 3556 - Food Products Machinery
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 4,000,000 Pounds
Production Hrs. Annual 4,420
Location (State) WY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $116,220 2,961,899 kWh $0.04
Natural Gas $75,402 21,006 MMBtu $3.59
TOTAL ENERGY COSTS $191,622
RECOMMENDED SAVINGS* $27,680 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,422
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$253
Cost:
$250
$253 6,448 - - - - $253
6,448
kWh
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$666
Cost:
$500
$666 16,999 - - - - $666
16,999
kWh
-
-
MMBtu
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,591
Cost:
$200
- - $4,591 1,101 - - -
-
kWh
$4,591
1,101
MMBtu
-
-
$
04: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$475
Cost:
$534
- - $475 114 - - -
-
kWh
$475
114
MMBtu
-
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,363
Cost:
$200
$2,363 - - - - - $2,363
-
kWh
-
-
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,589
Cost:
$300
- - $1,589 381 - - -
-
kWh
$1,589
381
MMBtu
-
-
$
07: 2.1222 INSTALL TURBULATORS Savings:
$1,268
Cost:
$500
- - $1,268 304 - - -
-
kWh
$1,268
304
MMBtu
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,801
Cost:
$1,500
- - $1,801 432 - - -
-
kWh
$1,801
432
MMBtu
-
-
$
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$555
Cost:
$700
- - $555 133 - - -
-
kWh
$555
133
MMBtu
-
-
$
10: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,094
Cost:
$5,000
- - $3,094 742 - - -
-
kWh
$3,094
742
MMBtu
-
-
$
11: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$3,959
Cost:
$9,000
- - $3,002 720 $957 - -
-
kWh
$3,002
720
MMBtu
$957
-
$
12: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$7,066
Cost:
$1,000
$7,066 180,246 - - - - $7,066
180,246
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$27,680
Cost:
$19,684
$10,348 203,693 $16,375 3,927 $957 - $10,348
203,693
kWh
$16,375
3,927
MMBtu
$957
-
$
TOTAL IMPLEMENTED Savings:
$20,422
Cost:
$12,984
$7,985 203,693 $11,480 2,753 $957 - $7,985
203,693
kWh
$11,480
2,753
MMBtu
$957
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes