IAC Assessment: CO0049
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0049
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1985
Principal Product ICE MAKING MACHINES
NAICS n/a
SIC 3585 - Refrigeration And Heating Equipment
Sales $10,000,000-$50,000,000
# of Employees 210
Plant Area (Sq.Ft.) 0
Annual Production 18,000 Pieces
Production Hrs. Annual 4,420
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $201,290 3,660,610 kWh $0.05
Natural Gas $77,896 16,468 MMBtu $4.73
TOTAL ENERGY COSTS $279,186
RECOMMENDED SAVINGS* $43,139 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,010
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$614
Cost:
$1,050
$614 11,137 - - $614
11,137
kWh
-
-
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,488
Cost:
$300
- - $1,488 315 -
-
kWh
$1,488
315
MMBtu
03: 2.1222 INSTALL TURBULATORS Savings:
$1,131
Cost:
$1,000
- - $1,131 239 -
-
kWh
$1,131
239
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,411
Cost:
$4,000
- - $2,411 510 -
-
kWh
$2,411
510
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,347
Cost:
$200
$1,347 24,619 - - $1,347
24,619
kWh
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$296
Cost:
$250
$296 5,275 - - $296
5,275
kWh
-
-
MMBtu
07: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$3,828
Cost:
$2,800
$3,828 - - - $3,828
-
kWh
-
-
MMBtu
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$11,647
Cost:
$20,000
$15,145 50,703 $(-3,498) (-740) $15,145
50,703
kWh
$(-3,498)
(-740)
MMBtu
09: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$379
Cost:
$100
$379 7,034 - - $379
7,034
kWh
-
-
MMBtu
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,284
Cost:
$2,039
$3,284 59,789 - - $3,284
59,789
kWh
-
-
MMBtu
11: 2.8122 USE UTILITY CONTROLLED POWER MANAGEMENT Savings:
$16,714
Cost:
$25,000
$16,714 - - - $16,714
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$43,139
Cost:
$56,739
$41,607 158,557 $1,532 324 $41,607
158,557
kWh
$1,532
324
MMBtu
TOTAL IMPLEMENTED Savings:
$22,010
Cost:
$28,700
$21,609 98,768 $401 85 $21,609
98,768
kWh
$401
85
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas