IAC Assessment: CO0074
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0074
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1986
Principal Product VARIOS LENGTH/WIDTH BOARD
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 27,300 Thousand Feet
Production Hrs. Annual 4,160
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $196,888 2,805,100 kWh $0.07
Natural Gas $10,504 4,734 MMBtu $2.22
Wood $101,700 101,704 MMBtu $1.00
TOTAL ENERGY COSTS $309,092
RECOMMENDED SAVINGS* $78,669 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,415
#|Description Savings
Cost
Status Electricity Usage Natural Gas Wood Electricity Usage Natural Gas Wood
$ kWh $ MMBtu $ MMBtu
01: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$11,487
Cost:
$120,000
$16,220 291,325 - - $(-4,733) (-4,733) $16,220
291,325
kWh
-
-
MMBtu
$(-4,733)
(-4,733)
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$10,038
Cost:
$4,650
$10,038 143,025 - - - - $10,038
143,025
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$16,456
Cost:
-
$16,456 234,467 - - - - $16,456
234,467
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,724
Cost:
$2,000
$1,584 22,567 $140 63 - - $1,584
22,567
kWh
$140
63
MMBtu
-
-
MMBtu
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$31,018
Cost:
-
$31,018 - - - - - $31,018
-
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,296
Cost:
$400
$1,296 18,464 - - - - $1,296
18,464
kWh
-
-
MMBtu
-
-
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,810
Cost:
-
$1,810 25,791 - - - - $1,810
25,791
kWh
-
-
MMBtu
-
-
MMBtu
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,571
Cost:
$500
$2,571 36,635 - - - - $2,571
36,635
kWh
-
-
MMBtu
-
-
MMBtu
10: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$638
Cost:
$200
$638 9,086 - - - - $638
9,086
kWh
-
-
MMBtu
-
-
MMBtu
11: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,405
Cost:
$1,000
$1,625 23,154 $(-220) (-99) - - $1,625
23,154
kWh
$(-220)
(-99)
MMBtu
-
-
MMBtu
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$226
Cost:
$132
$226 3,224 - - - - $226
3,224
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$78,669
Cost:
$128,882
$83,482 807,738 $(-80) (-36) $(-4,733) (-4,733) $83,482
807,738
kWh
$(-80)
(-36)
MMBtu
$(-4,733)
(-4,733)
MMBtu
TOTAL IMPLEMENTED Savings:
$63,415
Cost:
$5,682
$63,415 461,606 - - - - $63,415
461,606
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Wood Electricity Usage Natural Gas Wood