IAC logo
IAC Assessment: CO0098
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0098
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1987
Principal Product AERONAUTIC MAPS,MANUALS
NAICS n/a
SIC 2741 - Miscellaneous Publishing
Sales $10,000,000-$50,000,000
# of Employees 450
Plant Area (Sq.Ft.) 0
Annual Production 11,000,000 Pieces
Production Hrs. Annual 4,484
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $208,041 3,962,778 kWh $0.05
Natural Gas $25,576 6,522 MMBtu $3.92
TOTAL ENERGY COSTS $233,617
RECOMMENDED SAVINGS* $9,591 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,591
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,017
Cost:
$400
- - $1,017 260 -
-
kWh
$1,017
260
MMBtu
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,484
Cost:
$470
- - $1,484 378 -
-
kWh
$1,484
378
MMBtu
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$1,433
Cost:
$1,800
$1,433 27,257 - - $1,433
27,257
kWh
-
-
MMBtu
04: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$275
Cost:
-
$275 5,275 - - $275
5,275
kWh
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$275
Cost:
$900
$275 5,275 - - $275
5,275
kWh
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$664
Cost:
$1,200
- - $664 170 -
-
kWh
$664
170
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$97
Cost:
$341
$97 1,758 - - $97
1,758
kWh
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,346
Cost:
$5,000
$4,346 82,943 - - $4,346
82,943
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$9,591
Cost:
$10,111
$6,426 122,508 $3,165 808 $6,426
122,508
kWh
$3,165
808
MMBtu
TOTAL IMPLEMENTED Savings:
$6,591
Cost:
$7,011
$4,443 84,701 $2,148 548 $4,443
84,701
kWh
$2,148
548
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas