IAC logo
IAC Assessment: CO0130
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0130
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1988
Principal Product TOOL BITS FOR MINING
NAICS n/a
SIC 3462 - Iron And Steel Forgings
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 670,000 Pieces
Production Hrs. Annual 4,290
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $102,322 1,728,019 kWh $0.06
Natural Gas $76,578 20,327 MMBtu $3.77
TOTAL ENERGY COSTS $178,900
RECOMMENDED SAVINGS* $12,113 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,357
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$4,097
Cost:
$12,000
- - - - $4,097 - -
-
kWh
-
-
MMBtu
$4,097
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$406
Cost:
-
$406 6,741 - - - - $406
6,741
kWh
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,197
Cost:
$200
$1,197 20,223 - - - - $1,197
20,223
kWh
-
-
MMBtu
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,756
Cost:
$500
$2,756 - - - $(-1,000) - $2,756
-
kWh
-
-
MMBtu
$(-1,000)
-
$
05: 2.2514 COVER OPEN TANKS Savings:
$1,520
Cost:
$300
$864 14,654 $656 174 - - $864
14,654
kWh
$656
174
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$744
Cost:
$200
$744 12,603 - - - - $744
12,603
kWh
-
-
MMBtu
-
-
$
07: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$185
Cost:
$200
- - $185 49 - - -
-
kWh
$185
49
MMBtu
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,046
Cost:
$200
$703 11,723 $343 91 - - $703
11,723
kWh
$343
91
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,162
Cost:
$992
$1,162 19,637 - - - - $1,162
19,637
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$12,113
Cost:
$14,592
$7,832 85,581 $1,184 314 $3,097 - $7,832
85,581
kWh
$1,184
314
MMBtu
$3,097
-
$
TOTAL IMPLEMENTED Savings:
$10,357
Cost:
$14,092
$5,076 85,581 $1,184 314 $4,097 - $5,076
85,581
kWh
$1,184
314
MMBtu
$4,097
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes