IAC logo
IAC Assessment: CO0171
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0171
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1990
Principal Product POLYURETHANE COATINGS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 15
Plant Area (Sq.Ft.) 0
Annual Production 260,000 Pounds
Production Hrs. Annual 2,210
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $30,561 584,994 kWh $0.05
Natural Gas $25,244 5,947 MMBtu $4.24
TOTAL ENERGY COSTS $55,805
RECOMMENDED SAVINGS* $6,117 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,795
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,837
Cost:
$200
$1,543 - $1,294 - $1,543
-
kWh
$1,294
-
MMBtu
02: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$300
Cost:
$200
$300 5,862 - - $300
5,862
kWh
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,290
Cost:
$50
$540 10,258 $750 177 $540
10,258
kWh
$750
177
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$288
Cost:
$339
$288 5,862 - - $288
5,862
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$80
Cost:
$177
$80 1,465 - - $80
1,465
kWh
-
-
MMBtu
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,322
Cost:
$3,600
$(-38) (-586) $1,360 340 $(-38)
(-586)
kWh
$1,360
340
MMBtu
TOTAL RECOMMENDED Savings:
$6,117
Cost:
$4,566
$2,713 22,861 $3,404 517 $2,713
22,861
kWh
$3,404
517
MMBtu
TOTAL IMPLEMENTED Savings:
$4,795
Cost:
$966
$2,751 23,447 $2,044 177 $2,751
23,447
kWh
$2,044
177
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas