IAC logo
IAC Assessment: CO0173
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0173
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1990
Principal Product PRINTED CIRCUIT BOARDS
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $1,000,000-$5,000,000
# of Employees 47
Plant Area (Sq.Ft.) 0
Annual Production 175,000 Pieces
Production Hrs. Annual 4,628
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $37,993 495,897 kWh $0.08
Natural Gas $2,969 744 MMBtu $3.99
TOTAL ENERGY COSTS $40,962
RECOMMENDED SAVINGS* $5,960 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,660
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,300
Cost:
$500
$3,300 - - - $3,300
-
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,010
Cost:
$220
$1,010 13,189 - - $1,010
13,189
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$70
Cost:
$190
$70 879 - - $70
879
kWh
-
-
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$910
Cost:
$800
$540 20,809 $370 93 $540
20,809
kWh
$370
93
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$460
Cost:
$200
$460 6,155 - - $460
6,155
kWh
-
-
MMBtu
06: 2.2514 COVER OPEN TANKS Savings:
$210
Cost:
$400
$210 2,931 - - $210
2,931
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$5,960
Cost:
$2,310
$5,590 43,963 $370 93 $5,590
43,963
kWh
$370
93
MMBtu
TOTAL IMPLEMENTED Savings:
$2,660
Cost:
$1,810
$2,290 43,963 $370 93 $2,290
43,963
kWh
$370
93
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas