IAC logo
IAC Assessment: CO0190
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0190
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1990
Principal Product PRIME MOVER CONTROLS
NAICS n/a
SIC 3625 - Relays And Industrial Controls
Sales $50,000,000-$100,000,000
# of Employees 1,100
Plant Area (Sq.Ft.) 0
Annual Production 100,000 Pieces
Production Hrs. Annual 5,460
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $733,084 17,365,475 kWh $0.04
Natural Gas $110,777 28,680 MMBtu $3.86
TOTAL ENERGY COSTS $843,861
RECOMMENDED SAVINGS* $72,665 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,781
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$18,396
Cost:
$4,200
- - $18,396 - -
-
kWh
$18,396
-
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$12,172
Cost:
$3,000
$12,172 288,394 - - $12,172
288,394
kWh
-
-
MMBtu
03: 2.7262 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS Savings:
$12,764
Cost:
$20,000
$5,783 383,353 $6,981 1,809 $5,783
383,353
kWh
$6,981
1,809
MMBtu
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$10,341
Cost:
$8,200
$10,341 245,018 - - $10,341
245,018
kWh
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,432
Cost:
$10,800
$3,405 225,674 $5,027 1,302 $3,405
225,674
kWh
$5,027
1,302
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,041
Cost:
$3,783
$1,041 24,619 - - $1,041
24,619
kWh
-
-
MMBtu
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,555
Cost:
$2,000
- - $1,555 483 -
-
kWh
$1,555
483
MMBtu
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,871
Cost:
$1,998
$1,871 44,256 - - $1,871
44,256
kWh
-
-
MMBtu
09: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$2,147
Cost:
$6,000
- - $2,147 667 -
-
kWh
$2,147
667
MMBtu
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,910
Cost:
$3,708
$1,910 45,428 - - $1,910
45,428
kWh
-
-
MMBtu
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,544
Cost:
$300
$1,544 36,635 - - $1,544
36,635
kWh
-
-
MMBtu
12: 2.2511 INSULATE BARE EQUIPMENT Savings:
$492
Cost:
$103
$492 11,723 - - $492
11,723
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$72,665
Cost:
$64,092
$38,559 1,305,100 $34,106 4,261 $38,559
1,305,100
kWh
$34,106
4,261
MMBtu
TOTAL IMPLEMENTED Savings:
$41,781
Cost:
$45,692
$28,218 1,060,082 $13,563 3,594 $28,218
1,060,082
kWh
$13,563
3,594
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas