IAC logo
IAC Assessment: CO0200
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0200
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1990
Principal Product BAGS - PAPER & CAN-LIDS
NAICS n/a
SIC 2674 - Bags: Uncoated Paper & Multiwall
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 0
Annual Production 42,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $16,863 289,273 kWh $0.06
Natural Gas $28,021 7,007 MMBtu $4.00
TOTAL ENERGY COSTS $44,884
RECOMMENDED SAVINGS* $10,260 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,920
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,200
Cost:
$2,250
$60 2,345 $4,140 1,076 $60
2,345
kWh
$4,140
1,076
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$420
Cost:
$280
$420 7,620 - - $420
7,620
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,570
Cost:
$320
$1,570 27,843 - - $1,570
27,843
kWh
-
-
MMBtu
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,500
Cost:
$250
$480 - $1,020 - $480
-
kWh
$1,020
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$950
Cost:
$2,000
- - $950 248 -
-
kWh
$950
248
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$580
Cost:
$990
$580 10,258 - - $580
10,258
kWh
-
-
MMBtu
07: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$540
Cost:
$1,800
- - $540 140 -
-
kWh
$540
140
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$500
Cost:
$700
$500 8,792 - - $500
8,792
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$10,260
Cost:
$8,590
$3,610 56,858 $6,650 1,464 $3,610
56,858
kWh
$6,650
1,464
MMBtu
TOTAL IMPLEMENTED Savings:
$1,920
Cost:
$530
$900 7,620 $1,020 - $900
7,620
kWh
$1,020
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas