IAC logo
IAC Assessment: CO0227
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0227
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1991
Principal Product ALUMINUM SHEET
NAICS n/a
SIC 3353 - Aluminum Sheet, Plate, And Foil
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 71,000,000 Pounds
Production Hrs. Annual 8,688
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,092,513 28,852,580 kWh $0.04
Natural Gas $1,595,591 459,615 MMBtu $3.47
TOTAL ENERGY COSTS $2,688,104
RECOMMENDED SAVINGS* $30,149 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,149
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$632
Cost:
$275
$632 16,706 - - $632
16,706
kWh
-
-
MMBtu
02: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$7,150
Cost:
$3,500
- - $7,150 2,060 -
-
kWh
$7,150
2,060
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,890
Cost:
$4,720
$2,890 76,202 - - $2,890
76,202
kWh
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,080
Cost:
$23,725
$13,080 345,252 - - $13,080
345,252
kWh
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,897
Cost:
$3,595
$1,897 99,648 - - $1,897
99,648
kWh
-
-
MMBtu
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$4,500
Cost:
$20,650
$4,500 118,699 - - $4,500
118,699
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$30,149
Cost:
$56,465
$22,999 656,507 $7,150 2,060 $22,999
656,507
kWh
$7,150
2,060
MMBtu
TOTAL IMPLEMENTED Savings:
$30,149
Cost:
$56,465
$22,999 656,507 $7,150 2,060 $22,999
656,507
kWh
$7,150
2,060
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas