IAC logo
IAC Assessment: CO0241
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0241
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1992
Principal Product Cast Aluminum
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 35
Plant Area (Sq.Ft.) 32,000
Annual Production 1,000,000 Pounds
Production Hrs. Annual 2,210
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $14,573 170,281 kWh $0.09
Natural Gas $42,158 9,410 MMBtu $4.48
TOTAL ENERGY COSTS $56,731
RECOMMENDED SAVINGS* $12,110 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,110
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$3,250
Cost:
$5
- - $3,250 726 -
-
kWh
$3,250
726
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$6,920
Cost:
$3,500
- - $6,920 1,590 -
-
kWh
$6,920
1,590
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$530
Cost:
$200
$530 6,155 - - $530
6,155
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$370
Cost:
$110
$370 4,396 - - $370
4,396
kWh
-
-
MMBtu
05: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$460
Cost:
$250
- - $460 106 -
-
kWh
$460
106
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$340
Cost:
$450
- - $340 78 -
-
kWh
$340
78
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$240
Cost:
$1,110
$240 2,931 - - $240
2,931
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$12,110
Cost:
$5,625
$1,140 13,482 $10,970 2,500 $1,140
13,482
kWh
$10,970
2,500
MMBtu
TOTAL IMPLEMENTED Savings:
$12,110
Cost:
$5,625
$1,140 13,482 $10,970 2,500 $1,140
13,482
kWh
$10,970
2,500
MMBtu
Savings
Cost
$ kWh $ MMBtu