Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1992 |
Principal Product | Computer Peripheral Equipment |
NAICS | n/a |
SIC | 3577 - Computer Peripheral Equipment, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 750 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 23,560 Pieces |
Production Hrs. Annual | 2,210 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $557,481 | 11,997,949 | kWh | $0.05 |
Natural Gas | $37,917 | 8,598 | MMBtu | $4.41 |
TOTAL ENERGY COSTS | $595,398 | |||
RECOMMENDED SAVINGS* | $49,099 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $49,099 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS |
Savings: $4,930 Cost: $167,000 |
$4,930 | 106,096 | - | - | - | - |
$4,930 106,096 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3137 USE POWER DURING OFF-PEAK PERIODS |
Savings: $12,960 Cost: $250 |
- | - | - | - | $12,960 | - |
- - kWh |
- - MMBtu |
$12,960 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $4,930 Cost: $2,670 |
$640 | 41,618 | $4,290 | 938 | - | - |
$640 41,618 kWh |
$4,290 938 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7314 REDUCE VENTILATION AIR |
Savings: $6,040 Cost: $1,270 |
$470 | 33,998 | $5,570 | 1,264 | - | - |
$470 33,998 kWh |
$5,570 1,264 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $10,939 Cost: $8,660 |
$17,624 | 379,250 | $(-6,685) | (-1,618) | - | - |
$17,624 379,250 kWh |
$(-6,685) (-1,618) MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $450 Cost: $150 |
- | - | $450 | 102 | - | - |
- - kWh |
$450 102 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $350 Cost: $300 |
$350 | 7,620 | - | - | - | - |
$350 7,620 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $3,410 Cost: $6,230 |
$3,410 | 73,271 | - | - | - | - |
$3,410 73,271 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $3,900 Cost: $8,300 |
$3,900 | 259,672 | - | - | - | - |
$3,900 259,672 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS |
Savings: $810 Cost: $2,600 |
$810 | 17,292 | - | - | - | - |
$810 17,292 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE |
Savings: $140 Cost: $240 |
$140 | 9,379 | - | - | - | - |
$140 9,379 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE |
Savings: $240 Cost: $1,120 |
$240 | 16,120 | - | - | - | - |
$240 16,120 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $49,099 Cost: $198,790 |
$32,514 | 944,316 | $3,625 | 686 | $12,960 | - | $32,514 944,316 kWh |
$3,625 686 MMBtu |
$12,960 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $49,099 Cost: $198,790 |
$32,514 | 944,316 | $3,625 | 686 | $12,960 | - | $32,514 944,316 kWh |
$3,625 686 MMBtu |
$12,960 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |