IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1992
Principal Product Computer Parts
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 100
Plant Area (Sq.Ft.) 85,000
Annual Production 144,500 Pieces
Production Hrs. Annual 4,477
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $79,079 1,254,689 kWh $0.06
Natural Gas $8,556 2,134 MMBtu $4.01
TOTAL ENERGY COSTS $87,635
RECOMMENDED SAVINGS* $25,670 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,780
Cost:
$30
$840 13,482 $940 234 - - $840
13,482
kWh
$940
234
MMBtu
-
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,120
Cost:
$250
- - - - $1,120 - -
-
kWh
-
-
MMBtu
$1,120
-
$
03: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$530
Cost:
$200
- - $530 132 - - -
-
kWh
$530
132
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$480
Cost:
$100
$480 7,620 - - - - $480
7,620
kWh
-
-
MMBtu
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$470
Cost:
$300
$470 17,878 - - - - $470
17,878
kWh
-
-
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,100
Cost:
$2,840
- - $1,100 274 - - -
-
kWh
$1,100
274
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$430
Cost:
$220
$430 6,741 - - - - $430
6,741
kWh
-
-
MMBtu
-
-
$
08: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,110
Cost:
$3,200
$(-230) (-3,517) $2,340 583 - - $(-230)
(-3,517)
kWh
$2,340
583
MMBtu
-
-
$
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$340
Cost:
$240
$340 12,896 - - - - $340
12,896
kWh
-
-
MMBtu
-
-
$
10: 2.2514 COVER OPEN TANKS Savings:
$370
Cost:
$360
$370 12,896 - - - - $370
12,896
kWh
-
-
MMBtu
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,520
Cost:
$1,060
$4,520 71,805 - - - - $4,520
71,805
kWh
-
-
MMBtu
-
-
$
12: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,800
Cost:
$4,250
$3,800 64,771 - - - - $3,800
64,771
kWh
-
-
MMBtu
-
-
$
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,930
Cost:
$27,850
$6,930 109,906 - - - - $6,930
109,906
kWh
-
-
MMBtu
-
-
$
14: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,690
Cost:
$3,100
$1,690 26,671 - - - - $1,690
26,671
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$25,670
Cost:
$44,000
$19,640 341,149 $4,910 1,223 $1,120 - $19,640
341,149
kWh
$4,910
1,223
MMBtu
$1,120
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes