IAC logo
IAC Assessment: CO0290
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0290
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1993
Principal Product Aluminum Beverage Containers
NAICS n/a
SIC 3411 - Metal Cans
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 330,000
Annual Production 1,800,000,000 Pieces
Production Hrs. Annual 8,640
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,439,517 33,578,254 kWh $0.04
Natural Gas $508,859 176,076 MMBtu $2.89
TOTAL ENERGY COSTS $1,948,376
RECOMMENDED SAVINGS* $45,460 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,110
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,960
Cost:
$6,140
$13,960 325,615 - - $13,960
325,615
kWh
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$12,920
Cost:
$16,060
$12,920 301,583 - - $12,920
301,583
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,750
Cost:
$30,180
$10,750 250,879 - - $10,750
250,879
kWh
-
-
MMBtu
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$3,580
Cost:
$5,000
- - $3,580 1,240 -
-
kWh
$3,580
1,240
MMBtu
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,350
Cost:
$2,500
- - $3,350 1,158 -
-
kWh
$3,350
1,158
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$900
Cost:
$150
- - $900 307 -
-
kWh
$900
307
MMBtu
TOTAL RECOMMENDED Savings:
$45,460
Cost:
$60,030
$37,630 878,077 $7,830 2,705 $37,630
878,077
kWh
$7,830
2,705
MMBtu
TOTAL IMPLEMENTED Savings:
$42,110
Cost:
$57,530
$37,630 878,077 $4,480 1,547 $37,630
878,077
kWh
$4,480
1,547
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas