IAC logo
IAC Assessment: CO0317
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0317
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1994
Principal Product capacitors and resistors
NAICS n/a
SIC 3675 - Electronic Capacitors
Sales $1,000,000-$5,000,000
# of Employees 95
Plant Area (Sq.Ft.) 75,000
Annual Production 6,500,000 Pieces
Production Hrs. Annual 4,290
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,740 1,417,937 kWh $0.05
Natural Gas $15,500 3,410 MMBtu $4.55
TOTAL ENERGY COSTS $86,240
RECOMMENDED SAVINGS* $17,163 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,450
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (haz) Gaseous Waste Electricity Usage Natural Gas Other Liquid (haz) Gaseous Waste
$ kWh $ MMBtu $ gal $ lb
01: 3.8122 USE TIGHT-FITTING LIDS ON MATERIAL CONTAINERS TO REDUCE VOC EMISSIONS Savings:
$6,860
Cost:
$720
- - - - $5,300 11,900 $1,560 - -
-
kWh
-
-
MMBtu
$5,300
11,900
gal
$1,560
-
lb
02: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$3,603
Cost:
$7,080
$(-42) (-879) - - $3,645 8,680 - - $(-42)
(-879)
kWh
-
-
MMBtu
$3,645
8,680
gal
-
-
lb
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,790
Cost:
$520
$1,790 36,049 - - - - - - $1,790
36,049
kWh
-
-
MMBtu
-
-
gal
-
-
lb
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,600
Cost:
$150
$750 14,947 $850 187 - - - - $750
14,947
kWh
$850
187
MMBtu
-
-
gal
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,270
Cost:
$2,070
$1,270 25,498 - - - - - - $1,270
25,498
kWh
-
-
MMBtu
-
-
gal
-
-
lb
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$880
Cost:
$1,340
$880 17,878 - - - - - - $880
17,878
kWh
-
-
MMBtu
-
-
gal
-
-
lb
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$700
Cost:
$300
$700 14,068 - - - - - - $700
14,068
kWh
-
-
MMBtu
-
-
gal
-
-
lb
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$460
Cost:
$150
$460 9,379 - - - - - - $460
9,379
kWh
-
-
MMBtu
-
-
gal
-
-
lb
09: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
-
Cost:
$140
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
gal
-
-
lb
TOTAL RECOMMENDED Savings:
$17,163
Cost:
$12,470
$5,808 116,940 $850 187 $8,945 20,580 $1,560 - $5,808
116,940
kWh
$850
187
MMBtu
$8,945
20,580
gal
$1,560
-
lb
TOTAL IMPLEMENTED Savings:
$4,450
Cost:
$4,000
$3,600 72,391 $850 187 - - - - $3,600
72,391
kWh
$850
187
MMBtu
-
-
gal
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ gal $ lb
Electricity Usage Natural Gas Other Liquid (haz) Gaseous Waste Electricity Usage Natural Gas Other Liquid (haz) Gaseous Waste