Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1994 |
Principal Product | capacitors and resistors |
NAICS | n/a |
SIC | 3675 - Electronic Capacitors |
Sales | $1,000,000-$5,000,000 |
# of Employees | 95 |
Plant Area (Sq.Ft.) | 75,000 |
Annual Production | 6,500,000 Pieces |
Production Hrs. Annual | 4,290 |
Location (State) | NE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $70,740 | 1,417,937 | kWh | $0.05 |
Natural Gas | $15,500 | 3,410 | MMBtu | $4.55 |
TOTAL ENERGY COSTS | $86,240 | |||
RECOMMENDED SAVINGS* | $17,163 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,450 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (haz) | Gaseous Waste | Electricity Usage | Natural Gas | Other Liquid (haz) | Gaseous Waste | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.8122 USE TIGHT-FITTING LIDS ON MATERIAL CONTAINERS TO REDUCE VOC EMISSIONS |
Savings: $6,860 Cost: $720 |
- | - | - | - | $5,300 | 11,900 | $1,560 | - |
- - kWh |
- - MMBtu |
$5,300 11,900 gal |
$1,560 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE |
Savings: $3,603 Cost: $7,080 |
$(-42) | (-879) | - | - | $3,645 | 8,680 | - | - |
$(-42) (-879) kWh |
- - MMBtu |
$3,645 8,680 gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,790 Cost: $520 |
$1,790 | 36,049 | - | - | - | - | - | - |
$1,790 36,049 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $1,600 Cost: $150 |
$750 | 14,947 | $850 | 187 | - | - | - | - |
$750 14,947 kWh |
$850 187 MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,270 Cost: $2,070 |
$1,270 | 25,498 | - | - | - | - | - | - |
$1,270 25,498 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $880 Cost: $1,340 |
$880 | 17,878 | - | - | - | - | - | - |
$880 17,878 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $700 Cost: $300 |
$700 | 14,068 | - | - | - | - | - | - |
$700 14,068 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $460 Cost: $150 |
$460 | 9,379 | - | - | - | - | - | - |
$460 9,379 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE |
Savings: - Cost: $140 |
- | - | - | - | - | - | - | - |
- - kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $17,163 Cost: $12,470 |
$5,808 | 116,940 | $850 | 187 | $8,945 | 20,580 | $1,560 | - | $5,808 116,940 kWh |
$850 187 MMBtu |
$8,945 20,580 gal |
$1,560 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,450 Cost: $4,000 |
$3,600 | 72,391 | $850 | 187 | - | - | - | - | $3,600 72,391 kWh |
$850 187 MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (haz) | Gaseous Waste | Electricity Usage | Natural Gas | Other Liquid (haz) | Gaseous Waste |