Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1994 |
Principal Product | envelopes |
NAICS | n/a |
SIC | 2677 - Envelopes |
Sales | $10,000,000-$50,000,000 |
# of Employees | 87 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 670,000,000 Pieces |
Production Hrs. Annual | 8,520 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $158,800 | 3,311,841 | kWh | $0.05 |
Natural Gas | $18,310 | 4,450 | MMBtu | $4.11 |
TOTAL ENERGY COSTS | $177,110 | |||
RECOMMENDED SAVINGS* | $39,040 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (haz) | Electricity Usage | Natural Gas | Other Liquid (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.5121 RECYCLE WASTE INK AND CLEANUP SOLVENT |
Savings: $11,210 Cost: $6,150 |
- | - | - | - | $11,210 | 4,900 |
- - kWh |
- - MMBtu |
$11,210 4,900 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE |
Savings: $6,370 Cost: $7,200 |
$(-180) | (-3,810) | - | - | $6,550 | 20,100 |
$(-180) (-3,810) kWh |
- - MMBtu |
$6,550 20,100 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,310 Cost: $5,820 |
$6,310 | 131,594 | - | - | - | - |
$6,310 131,594 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,730 Cost: $460 |
$5,730 | 119,578 | - | - | - | - |
$5,730 119,578 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $4,320 Cost: $6,800 |
$(-310) | (-6,448) | $4,630 | 1,075 | - | - |
$(-310) (-6,448) kWh |
$4,630 1,075 MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $2,000 Cost: $460 |
$2,000 | 37,808 | - | - | - | - |
$2,000 37,808 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,000 Cost: $840 |
$2,000 | 41,618 | - | - | - | - |
$2,000 41,618 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,100 Cost: $210 |
$1,100 | 23,154 | - | - | - | - |
$1,100 23,154 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $39,040 Cost: $27,940 |
$16,650 | 343,494 | $4,630 | 1,075 | $17,760 | 25,000 | $16,650 343,494 kWh |
$4,630 1,075 MMBtu |
$17,760 25,000 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (haz) | Electricity Usage | Natural Gas | Other Liquid (haz) |